Service
Condo and New Build Painting in Ottawa
Condo interiors and new construction, with building rules, elevator bookings and new drywall priming handled.

Condominium interiors and new construction share a set of conditions that most painting work does not have. The building has rules about when and how work can happen. Access is through shared space that has to be protected. The surfaces are often new, and new surfaces need a different approach from ones that have been lived on.
We paint condo units, rental apartments, townhome interiors and newly built houses, including walls, ceilings, trim, doors, closets and the interior of built in millwork. Where a unit is being prepared for sale or a new tenant, we work to a schedule that fits the turnover.
- Condo and apartment interiors
- New build walls and ceilings
- Trim, doors and closets
- New drywall priming
- Builder paint recoats
- Turnover and pre sale work
Before we start
Building rules, elevator bookings and any required paperwork.
02 / Building rules
The building sets the schedule.
Most condo buildings restrict when trades can work and how materials move through the building. Typical requirements include a booking for the service elevator, protection on the corridor floor and wall, a work window during weekday hours, and confirmation of insurance held on file with the property manager. Some buildings also require a deposit for elevator use.
We plan around those rules rather than discovering them on the first morning. Tell us what your building requires and who to speak with. Where a building manager wants to review the scope in advance, the written scope is usually enough.
Protection of common areas is part of the job. Corridors, thresholds and the elevator are covered along the route the work uses, and the protection is removed once the last load has gone back out.
In a condo, the building is a client too. The rules decide the schedule as much as the paint does.
03 / New surfaces
Priming new drywall is not optional.
New drywall has a paper face that absorbs paint differently from the joint compound filling the seams. Without a primer formulated for new board, the topcoat dries unevenly and the taped joints show as patches or sheen differences, especially on ceilings and under windows. The primer equalises absorption so the finish reads as one surface.
Builder grade flat paint is common in new construction. It covers board adequately and is chosen for cost, but it marks easily and cannot be washed. A recoat in a washable finish before furniture arrives is the practical moment to change it.
New construction also brings dust. Fine gypsum dust settles on every surface and will contaminate a finish if it is not removed first. We clean before painting, and we work in an order that does not put wet paint under a source of dust.
04 / Ottawa notes
Towers, tight corridors and winter move ins.
Most of Ottawa's condo stock sits downtown and along the transit corridors, in buildings with one service elevator and a single loading area. In Centretown and Westboro, materials often have to arrive on a schedule that suits a short term parking allowance, and the corridor from the loading area to the unit is the part that needs the most protection.
Winter move ins add salt and moisture to the building's floors. Protection goes down before anything is carried in, and the route is checked again at the end of each day.
New subdivisions on the edge of the city present a different problem: the house may be finished while the street is not. Access, parking and the dust from surrounding construction all affect how the work is sequenced, and it is worth confirming the closing date before the painting date is fixed.
05 / Scheduling
Working around a closing date.
For a new build, the best window is after the builder has finished its own touch ups and before your furniture arrives. That is usually a short gap, and it is worth telling us the closing date as soon as it is confirmed so the work can be planned for that window rather than after it.
For a condo repaint in an occupied unit, the work is staged room by room and the elevator booking determines how much can happen in a day. For a turnover between tenants, speed matters and the sequence is planned to finish the most visible rooms first.
Condo and new build questions.
Request a consultation.
Tell us the building, the dates available and what your property manager requires.
Request a consultation
Tell us a little about the space and the work. We reply by email with next steps and a time to walk through the project.